ICT in Education Toolkit Version 2.0a
September 2006
Manage Users |   How to Use the Toolkit   Concept and Blue Print   Logout
  Welcome , NIUE
Toolkit Map Filing Cabinet Team Bookshelf Search Handbook Toolkit Library My Messages
Tool 3.2: Hardware
  OVERVIEW
1 Audio/Radio
2 TV/Video
3 Computers
4 Basic Software
OUTPUT OF THIS TOOL
Reference Information
  Print This Tool

Toolbox 3:
Planning for Physical and Human Requirements
3.1 Infrastructure
3.2 Hardware
3.3 Personnel Training
View Toolkit Map
View ICT for Education Handbook
 
 
  4. Planning for Operating and Basic Software
 


The Facilitation Team, needs to plan for two categories of software that are essential elements of the computer hardware:

  • Operating system (OS) software for client and server computers;
  • Basic computer application software, including software for word processing, spreadsheets, presentations, and graphics.

Educational software for computer systems is discussed in Toolbox 4

The Facilitation Team may need to solicit the help of experts in this field as it applies this part of the Tool. This can be done in one of two ways:

  • Download the FORMs and send them the designated experts as email attachments
  • Authorize the experts to access the Tool and apply it as necessary

Step 1. Review of Need and Options

To formulate adequate plans, the Team needs to review first the following information.

Step 2. Determination of Requirements

Next, the Team determines hardware requirements for each institution served by the proposed ICT program.

Download the form below and use as a guide for data collection and deliberations. Also you may send the form as an email attachment to knowledgeable individuals or institutions seeking information or advice.

Enter the hardware requirements for each institutions by clicking on its name in the list below and completing the form once. Once the form is submitted a   appears next to the institutions' name.

Detailed technical specifications are not required at this stage. They will be prepared by specialists at a later stage and before procurement.

 Report on Required Software

Requirements for Computer Software List
  Niue High School
  Niue Primary School
Print-based Form
Download for offline use

Next

  Acknowledgements | Terms & Conditions

Copyright © 2006. All rights reserved.

Site designed and maintained by: Sonjara

UNESCO Bangkok JFIT InfoDev (World bank) AED Knowledge Enterprise