This Part of the Master Plan integrates summaries of the different components of planning for implementation generated by the different tools in Toolbox 3-5, into a comprehensive implementation plan. This Part is compiled automatically from the outputs of corresponding Tools.
For more details about the plans, particularly as they relate to Program institutions, planners need to go back to the corresponding files in the Filing Cabinet of Toolbox 3-5 and download them.
This Part includes five sections:
2.1 Geographic Areas and Institutions
2.2 Infrastructure
2.3 Hardware
2.4 Contentware
2.5 Personnel Orientation and training
The Integrated Implementation Plan may be viewed by going to the OUTPUT Section of this Tool, or by going to the Filing Cabinet – Tool 5.2: Part 2 – Integrated Implementation Plan
|